Technology

We design and build aerated composting infrastructure equipped with specialised air and water management systems to maximise outputs and minimise costs.

Our experience is based on upgrades to our facilities in Kembla Grange (2017), Nowra (2018) and the construction of the new Tweed Shire Council facility at Stotts Creek (2021).

Technology

Process

Closing the Loop

Design, Build and Operate

Critical Success Factors